Plumbing List
PLUMBING
CAT
PLM
SEL
RO-
Reverse osmosis water treatment system - 15 gpd
Reverse osmosis water treatment system - 15 gpd: This line item refers to the installation or replacement of a reverse osmosis (RO) water treatment system with a capacity of 15 gallons per day (gpd). These systems are designed to purify water by removing contaminants, ensuring access to clean and safe drinking water.
PLUMBING
CAT
PLM
SEL
RO>>
Reverse osmosis water treatment system - 50 gpd - high grade
Reverse osmosis water treatment system - 50 gpd - high grade: This line item refers to the installation or replacement of a high-grade reverse osmosis (RO) water treatment system with a capacity of 50 gallons per day (gpd). High-grade systems offer superior materials and filtration performance, ensuring the highest quality of purified water.
PLUMBING
CAT
PLM
SEL
RORS
Reverse osmosis water treatment system - Detach & reset
Reverse osmosis water treatment system - Detach & reset: This line item refers to the temporary removal and subsequent reinstallation of a reverse osmosis (RO) water treatment system. This process is often necessary during renovations or repairs, ensuring the system is safely detached and then reset to its original, functional position.
PLUMBING
CAT
PLM
SEL
ROUGH
Rough-in plumbing - includes supply and waste lines
This description involves the initial phase of plumbing installation, known as rough-in plumbing, which includes laying out both the supply and waste lines within a building. Rough-in plumbing is performed before walls and floors are finished and includes installing the pipes that will carry water to fixtures and the pipes that will carry waste away. This foundational work ensures that the plumbing system is properly integrated into the structure, allowing for smooth operation once fixtures are installed.
PLUMBING
CAT
PLM
SEL
ROUGHC
Rough-in plumbing - Commercial - 1-3 level
This line item pertains to the rough-in plumbing work for commercial buildings with one to three levels. It includes the installation of supply and waste lines necessary to provide water to and remove waste from various plumbing fixtures within the building. This stage of plumbing is crucial for ensuring that the infrastructure is in place to support the building’s water and waste management needs, tailored to the specific requirements of commercial properties of this size.
PLUMBING
CAT
PLM
SEL
ROUGHC+
Rough-in plumbing - Commercial - high rise
This item describes the rough-in plumbing work for high-rise commercial buildings, which are typically multi-story structures exceeding three levels. The installation includes supply and waste lines that must accommodate the increased demand and complexity of high-rise plumbing systems. This work involves extensive planning and implementation to ensure water pressure and waste removal are adequately managed throughout the building, considering the unique challenges posed by taller structures.
PLUMBING
CAT
PLM
SEL
ROUGHP
Rough-in plumbing - supply & waste lines, w/PEX - Branched
This line item refers to rough-in plumbing that utilizes PEX (cross-linked polyethylene) tubing for the supply and waste lines in a branched configuration. PEX is a flexible, durable material that is increasingly used in modern plumbing due to its ease of installation and resistance to corrosion. A branched system involves running separate lines from a central manifold to each fixture, allowing for more precise control and efficient water distribution. This setup is particularly beneficial for reducing pressure drops and ensuring consistent water flow throughout the building.
PLUMBING
CAT
PLM
SEL
SEWF
Sewage filtration/septic tank - 1500 gl.
Sewage filtration/septic tank - 1500 gl: This line item refers to the installation or replacement of a 1500-gallon sewage filtration/septic tank. These tanks are used for on-site wastewater treatment, providing effective sewage management for residential or commercial properties.
PLUMBING
CAT
PLM
SEL
SEWF<
Sewage filtration/septic tank - 1250 gl.
Sewage filtration/septic tank - 1250 gl: This line item refers to the installation or replacement of a 1250-gallon sewage filtration/septic tank. These tanks are essential for on-site wastewater treatment, ensuring proper sewage management and environmental protection.
PLUMBING
CAT
PLM
SEL
SEWF<<
Sewage filtration/septic tank - 1000 gl.
Sewage filtration/septic tank - 1000 gl: This line item refers to the installation or replacement of a 1000-gallon sewage filtration/septic tank. These tanks provide effective on-site sewage treatment, suitable for smaller residential or commercial applications.
PLUMBING
CAT
PLM
SEL
SEWF>
Sewage filtration/septic tank - 2000 gl.
Sewage filtration/septic tank - 2000 gl: This line item refers to the installation or replacement of a 2000-gallon sewage filtration/septic tank. These large-capacity tanks are used for on-site wastewater treatment in larger properties, ensuring efficient sewage management.
PLUMBING
CAT
PLM
SEL
SNKDRS
Sink - double basin - Detach & reset
Sink - double basin - Detach & reset: This line item refers to the temporary removal and subsequent reinstallation of a double basin sink. This process is necessary during renovations or repairs, ensuring the sink is safely detached and then reset to its original, functional position.
Category Name | Category Code | Selection Code | Line Item Description | Line Item Explanation |
|---|---|---|---|---|
PLUMBING | PLM | RO- | Reverse osmosis water treatment system - 15 gpd | Reverse osmosis water treatment system - 15 gpd: This line item refers to the installation or replacement of a reverse osmosis (RO) water treatment system with a capacity of 15 gallons per day (gpd). These systems are designed to purify water by removing contaminants, ensuring access to clean and safe drinking water. |
PLUMBING | PLM | RO>> | Reverse osmosis water treatment system - 50 gpd - high grade | Reverse osmosis water treatment system - 50 gpd - high grade: This line item refers to the installation or replacement of a high-grade reverse osmosis (RO) water treatment system with a capacity of 50 gallons per day (gpd). High-grade systems offer superior materials and filtration performance, ensuring the highest quality of purified water. |
PLUMBING | PLM | RORS | Reverse osmosis water treatment system - Detach & reset | Reverse osmosis water treatment system - Detach & reset: This line item refers to the temporary removal and subsequent reinstallation of a reverse osmosis (RO) water treatment system. This process is often necessary during renovations or repairs, ensuring the system is safely detached and then reset to its original, functional position. |
PLUMBING | PLM | ROUGH | Rough-in plumbing - includes supply and waste lines | This description involves the initial phase of plumbing installation, known as rough-in plumbing, which includes laying out both the supply and waste lines within a building. Rough-in plumbing is performed before walls and floors are finished and includes installing the pipes that will carry water to fixtures and the pipes that will carry waste away. This foundational work ensures that the plumbing system is properly integrated into the structure, allowing for smooth operation once fixtures are installed. |
PLUMBING | PLM | ROUGHC | Rough-in plumbing - Commercial - 1-3 level | This line item pertains to the rough-in plumbing work for commercial buildings with one to three levels. It includes the installation of supply and waste lines necessary to provide water to and remove waste from various plumbing fixtures within the building. This stage of plumbing is crucial for ensuring that the infrastructure is in place to support the building’s water and waste management needs, tailored to the specific requirements of commercial properties of this size. |
PLUMBING | PLM | ROUGHC+ | Rough-in plumbing - Commercial - high rise | This item describes the rough-in plumbing work for high-rise commercial buildings, which are typically multi-story structures exceeding three levels. The installation includes supply and waste lines that must accommodate the increased demand and complexity of high-rise plumbing systems. This work involves extensive planning and implementation to ensure water pressure and waste removal are adequately managed throughout the building, considering the unique challenges posed by taller structures. |
PLUMBING | PLM | ROUGHP | Rough-in plumbing - supply & waste lines, w/PEX - Branched | This line item refers to rough-in plumbing that utilizes PEX (cross-linked polyethylene) tubing for the supply and waste lines in a branched configuration. PEX is a flexible, durable material that is increasingly used in modern plumbing due to its ease of installation and resistance to corrosion. A branched system involves running separate lines from a central manifold to each fixture, allowing for more precise control and efficient water distribution. This setup is particularly beneficial for reducing pressure drops and ensuring consistent water flow throughout the building. |
PLUMBING | PLM | SEWF | Sewage filtration/septic tank - 1500 gl. | Sewage filtration/septic tank - 1500 gl: This line item refers to the installation or replacement of a 1500-gallon sewage filtration/septic tank. These tanks are used for on-site wastewater treatment, providing effective sewage management for residential or commercial properties. |
PLUMBING | PLM | SEWF< | Sewage filtration/septic tank - 1250 gl. | Sewage filtration/septic tank - 1250 gl: This line item refers to the installation or replacement of a 1250-gallon sewage filtration/septic tank. These tanks are essential for on-site wastewater treatment, ensuring proper sewage management and environmental protection. |
PLUMBING | PLM | SEWF<< | Sewage filtration/septic tank - 1000 gl. | Sewage filtration/septic tank - 1000 gl: This line item refers to the installation or replacement of a 1000-gallon sewage filtration/septic tank. These tanks provide effective on-site sewage treatment, suitable for smaller residential or commercial applications. |
PLUMBING | PLM | SEWF> | Sewage filtration/septic tank - 2000 gl. | Sewage filtration/septic tank - 2000 gl: This line item refers to the installation or replacement of a 2000-gallon sewage filtration/septic tank. These large-capacity tanks are used for on-site wastewater treatment in larger properties, ensuring efficient sewage management. |
PLUMBING | PLM | SNKDRS | Sink - double basin - Detach & reset | Sink - double basin - Detach & reset: This line item refers to the temporary removal and subsequent reinstallation of a double basin sink. This process is necessary during renovations or repairs, ensuring the sink is safely detached and then reset to its original, functional position. |